1 Day Contractor

Kitchen Remodeling in Northeast Ohio

You’ve been talking about updating the kitchen for two years. We’ll put the cost in writing and do the work right. Three-year warranty included.

Kitchen Updates That Make a Difference — Without the Drama

A kitchen remodel doesn’t have to mean moving out for a month. We work with you to define the scope, put the cost in writing, and keep the disruption to a minimum. One crew. Daily progress updates. You always know where things stand.

  • Countertop replacement (granite, quartz, butcher block, laminate)
  • Cabinet refacing, painting, or replacement
  • Tile backsplash installation
  • Sink and faucet replacement
  • Flooring removal and installation
  • Lighting updates and under-cabinet lighting
  • Pantry and storage solutions
  • Trim, molding, and finish carpentry
  • Painting
  • Minor plumbing and electrical for fixture changes

Kitchen Remodel Pricing — Every Cost Explained

Targeted update (countertops, backsplash, new faucet)$4,000–$8,000
Mid-range remodel (counters, cabinet refacing, flooring, fixtures, backsplash)$12,000–$25,000
Full renovation (new layout, cabinets, counters, flooring, lighting, fixtures)$25,000–$45,000+

Your written estimate will break down every line item. Materials, labor, and installation — all documented before we start.

Written Estimate

Every cost itemized before we start

No Hidden Fees

The price we quote is the price you pay

3-Year Warranty

Our work guaranteed, in writing

Why Homeowners Trust Us With Their Kitchen

  • You’ll know the full cost before we start. Written estimate with every material, every labor hour, every fixture explained. No vague “ballpark.”
  • One crew, one kitchen, start to finish. We don’t juggle your kitchen with three other jobs. You get our full attention every day.
  • We keep your home livable. Containment, dust barriers, daily cleanup. We know you still need to feed the family.
  • Master craftsmen doing the detail work. The trim, the tile lines, the cabinet alignment — the details that separate a good kitchen from a great one.

Frequently Asked Questions

A targeted update (counters, backsplash, faucet) can take 1–2 weeks. A full renovation typically takes 4–8 weeks. We’ll give you a realistic schedule in writing.

Yes. Not every kitchen needs a full gut. If new countertops and a backsplash will transform the space, that’s what we’ll recommend. We’re not going to upsell you into a bigger project than you need.

For fixture changes, relocations, and upgrades within the kitchen — yes. For major plumbing or electrical rerouting, we’ll bring in a licensed specialist and coordinate the work.

Ready to Stop Talking About It and Get It Done?

Tell us what you’re thinking for the kitchen. We’ll come look at the space and give you a written estimate — every cost, every option, no pressure.

Get Your Free Written Estimate

Or text Mike directly: (330) 630-3741

Free Estimate